Industrial Energy Infrastructure Finance
The unglamorous infrastructure that everything else depends on.
Transformers, switchgear, HV works, heat pumps, compressed air, CHP replacement. Nobody puts it on a website homepage, but it decides whether a site can grow.
Typical project size , £100,000 – £5,000,000
What usually gets in the way
- Grid capacity constraints block expansion long before planning does.
- Enabling infrastructure has no obvious revenue line, so it loses internal capital battles.
- Standard asset finance struggles with fixed, site-installed equipment.
Why businesses finance it
- Unlock capacity for production growth without a capital raise.
- Spread cost across the decades these assets actually last.
- Bundle multiple works packages into one structure.
How GRID helps
Structured by people who read the load profile first.
We fund fixed and installed electrical infrastructure, including HV works.
We speak to your M&E consultant directly when it speeds things up.
We coordinate funding across multi-stage engineering programmes.
Example projects
Real shapes, real structures.
Manufacturer HV upgrade
New substation and switchroom enabling a production line expansion.
Process heat electrification
Industrial heat pumps replacing gas-fired process heat.
Compressed air replacement
Efficient plant funded against measured energy savings.