UK haulage operator
A haulier needed six more compressed natural gas trucks to service growing contracts, while carrying a loss on the last set of accounts. We funded all six over five years with VAT deferred for three months.
The background
Growth and profit do not always arrive in the same year. This operator was winning work faster than the accounts could show it, and the last filed set carried a loss.
The fleet plan was sound. Compressed natural gas was already running alongside diesel on their existing trucks, so the fuel cost per mile was not a projection, it was history they could show us.
The problem
A loss on the most recent accounts closed the door with mainstream lenders before the conversation started.
Six trucks at once is a significant order, and drip feeding the order would have delayed contracts already awarded.
The VAT alone on a £680,000 order would have hit cash flow weeks before the trucks earned a penny.
How we looked at it
We built the proposal around the fuel data from the existing gas fleet, so the cost per mile argument was evidenced rather than claimed.
We set out the contracted revenue the six trucks were being bought to service, and how quickly they would be earning after delivery.
We were straight with the funder about the loss and explained what sat behind it, which is a far better position than hoping it goes unnoticed.
The funding solution
Hire purchase over five years across all six vehicles, so the operator owns the assets at the end of the term.
A 10% deposit, keeping the initial outlay proportionate to the size of the order.
All VAT deferred for three months, giving the trucks time to start generating revenue before that payment landed.
The outcome
All six trucks entered service together and went straight onto contracted work.
The fuel saving against the equivalent diesel units started from day one, which supported the turnaround the accounts had not yet caught up with.
The operator now has a repayment record with a funder that understands the fleet, which makes the next expansion a shorter conversation.
What we funded
- 6 x CNG gas tractor units
- Delivery and plating
- Deferred VAT facility
Structure: Hire purchase, 5 years, 10% deposit, VAT deferred 3 months